re psa backlog
RE capacity AWARDED BUT WITHOUT SIGNED PSA/PPA (the REIA backlog), PSAs signed, LoAs issued, and REIA bidding volumes - as officially STATED by MNRE in Lok Sabha answers, PIB releases and the Standing Committee on Energy (2024-2026): e.g. 43,922 MW unsigned as on 30.06.2025, 43,942 MW as on 30.09.2025, 42,626 MW as on 31.10.2025; LoAs ~69 GW vs PPAs ~24.3 GW as on 31.12.2025.